Started Aug 31/13
Finished Sept 8/13
This is a sample knit for JulieSpin. It has a due date of Oct 15/13.
I’ve never done a Tubular CO before. It wasn’t too bad and its very neat. I’m going done to size 3 needles since it was knitting up HUGE. It’s still big so going down to size 0.
Sept 4/13 - I’m going to frog back to the start of the cables. There are some errors that are bothering me and since this is a sample knit. I want it to look right.
Sept 8/13 - adding 10 more rows since the hat seems short. I should have done 20 more rows.
Needles: Size 3 and 0 circulars
Yarn: JulieSpins M230 SW Merino Worsted/DK in Dragonfly
Pattern: http://www.ravelry.com/patterns/library/hallgrim-hat
So Much to Do, So Little Time
2 days ago