Showing posts with label Dream In Color. Show all posts
Showing posts with label Dream In Color. Show all posts

Sunday, January 3, 2021

Fingering Nightshift - DONE!

Started Dec 28/19
Finished Dec 27/20


                                 








Needles:  Size 4 circulars

Yarn: The Lemonade Shop Cashmere Sock in OOAK Colorway Naughty Mud, Dream in Color Smooshy Cashmere in Tucson, Dream in Color Smooshy Cashmere in Pop Up Skein Club · December 2018, HeyHollyHoHum MCN Sock in Sailor Take Warning, The Lemonade Shop Mighty Sock in Rhinebeck and The Verdant Gryphon Skinny Bugga! in Paint War

Pattern:  https://www.ravelry.com/patterns/library/nightshift



Saturday, January 21, 2017

Test Shine On Mitts - DONE!

Started Jan 20/17
Finished Jan 23/17








Jan 21/17 - finish first mitt


Jan 22/17 - I did 17 more rounds after the thumb gusset.  I added 4 row of knit before ribbing on thumb (total of 5).


Needles:  Size 3 circular

Yarn:   Loop! BULLSEYE Bump Smoke + Mirror and Dream in Color Smooshy with Cashmere in The Watering Hole

Pattern:  http://www.ravelry.com/patterns/library/shine-on-mitts



Wednesday, November 25, 2015

March Grey Shawl - DONE!

Started Aug 3/13
Finished Nov 24/15






Needle:  Size 5 circular

Yarn:  Dream in Color Wisp in March '12

Pattern:  http://www.ravelry.com/patterns/library/vostok


Tuesday, July 19, 2011

Camp Loopy Red Mitts - DONE!

Started Jul 15/11
Finished Jul 24/11










This project has a due date of Aug 15/11.

Jul 15/11 - Instructions don’t have the # of cast on so I counted the stitches in the 1st row instructions. Will cast on 36 stitches.

Jul 17/11 - It’s not looking right so will redo. Cast on 45 stitches and try this pattern instead:

row 1,2 & 4 P2 (K4,P2,K1,P2) repeat 4x K4, P2, K1
row 3 P3 (sl 2 on dpn back, k2, k2 on dpn, p2,k1,p2) repeat 4x cable 2, p2, k1

I repeated the 4 rows 8 times. Then knitted 4 rows. Did a thumb increase:
K7, M1R, K1, M1L, K rest of row
K
K7, M1R, K3, M1L, K rest of row
K
Continue until you have increased 13 stitches. Put 13 stitches on waste yarn.

Continue knitting until 3 1/2” from thumb, or desired length.
Decrease rows -- -K6, K2tog- K , -K5, K2tog-, continue until K1, K2 tog, Decrease until only 8 st left.

Thumb -- Put 13 sts on needles and pick up 4 stitches for a total of 17.
Decrease K2, K2tog, next row knit plain, third row K1, K2tog. Thread through remaining stitches.

Jul 19/11 - finished the first mitt!

Needles: Size 3 circulars

Yarn: Dream in Color Classy in Valentine

Pattern: http://www.ravelry.com/patterns/library/girls-and-ladies-mittens