Tuesday, July 31, 2012
Stormy Night Shawl - Camp Loopy #3 - DONE!
Finished Aug 5/12
This project needs to be finished by Aug 27/12.
Needle: Size 5 circular
Yarn: JulieSpins Merino 370 in Columbine and Thunderstorm
Pattern: http://www.ravelry.com/patterns/library/shaws-cove
Wednesday, June 27, 2012
Blue Wing Shawl Camp Loopy #2 - DONE!
Finished Jul 10/12
This project must be done by Jul 27/12 and must be 800 yards. The color was suppose to be one of your country's flag. I picked blue.
Jul 1/12 - I might have to add to this shawl to get 800 yards knitted. I’ve knitted the right side and only used 256 yards.
Jul 6/12 - I’ve finished the shawl but have lots of yarn left. I kitchener the 2 pieces together instead of the 3 needle bind off. I will pick up stitches from the top edge and knit till I have used most of the yarn.
Jul 7/12 - I’ve finished but only used 513 yards so I will be adding to the top of the shawl about 60 rows. I’ve added 20 already but need to increase each side so it will look right.
Needle: Size 6 circulars
Yarn: Malabrigo Yarn Lace in Paris Night
Pattern: http://www.ravelry.com/patterns/library/dragon-wing-shawl-2
Saturday, June 9, 2012
Lake Shawl - Camp Loopy #1 - DONE!
Finished Jun 8/12
Monday, September 12, 2011
Earthquake Camp Loopy Shawl - DONE!
Finished Sept 5/11





My last Camp Loopy project! It has a due date of Sept 15/11. This yarn is very soft to work with and the coloring is very interesting. I didn't think I would like the combination of purple/brown/green. I wanted a wider shawl so I casted on 106 stitches.
Needles: Size 7 circular
Yarn: String Theory Hand Dyed Yarn Caper Sock in Earthquake
Pattern: http://www.ravelry.com/patterns/library/cambria-wrap
Tuesday, July 19, 2011
Camp Loopy Red Mitts - DONE!
Finished Jul 24/11





This project has a due date of Aug 15/11.
Jul 15/11 - Instructions don’t have the # of cast on so I counted the stitches in the 1st row instructions. Will cast on 36 stitches.
Jul 17/11 - It’s not looking right so will redo. Cast on 45 stitches and try this pattern instead:
row 1,2 & 4 P2 (K4,P2,K1,P2) repeat 4x K4, P2, K1
row 3 P3 (sl 2 on dpn back, k2, k2 on dpn, p2,k1,p2) repeat 4x cable 2, p2, k1
I repeated the 4 rows 8 times. Then knitted 4 rows. Did a thumb increase:
K7, M1R, K1, M1L, K rest of row
K
K7, M1R, K3, M1L, K rest of row
K
Continue until you have increased 13 stitches. Put 13 stitches on waste yarn.
Continue knitting until 3 1/2” from thumb, or desired length.
Decrease rows -- -K6, K2tog- K , -K5, K2tog-, continue until K1, K2 tog, Decrease until only 8 st left.
Thumb -- Put 13 sts on needles and pick up 4 stitches for a total of 17.
Decrease K2, K2tog, next row knit plain, third row K1, K2tog. Thread through remaining stitches.
Jul 19/11 - finished the first mitt!
Needles: Size 3 circulars
Yarn: Dream in Color Classy in Valentine
Pattern: http://www.ravelry.com/patterns/library/girls-and-ladies-mittens
Monday, June 27, 2011
Blue Loopy Groupie Shawl - DONE!
Finished Jul 2/11




This is part of Camp Loopy. It's a project that needs to be knitted between Jun 15 & Jul 15. I don't usually do good with deadlines but I'm going to try. I didn't think I could even be a part of this camp since we had to be evacuated due to wildfires in AZ.
Jun 26/11 - gotten back into knitting and knitted one skein so my about 1/4 done and 220 yards into my project!
Jun 28/11 - half way done!
Jul 2/11 - done! Had issues with my needles at the end so the bind off looks terrible. Just needs to be washed & blocked!
Needles: Size 4 & 7 circulars
Yarn: The Loopy Ewe Solid Series in Hydrangea & Royal Blue
Pattern: http://www.ravelry.com/patterns/library/pinkerton-shawl














